Structure Fire145 Holly, Grand Rapids

ClearedFire

Structure Fire

145 Holly, Grand Rapids

Timeline

  1. Engine 2 staging two units at 100 block of Holly, north side of the road west of Walden
  2. Smoke still coming from a vent on the Charlie (rear) side of the round silo; crews checking conditions
  3. Crews report heavy smoke still visible but cannot see down into the silo
  4. Crews conducting 360-degree walk-around inspection of the silo, checking the back (Charlie) side
  5. Command requesting additional crews to stage and stand by for the incident
  6. Command requesting crews to stage and stand by; tools to be brought down when needed
  7. Command reports water application is helping clear smoke from the exterior
  8. Command directing crews to remove roof vents; vent closest to the fire producing more smoke
  9. Crews removed one roof vent; working on the second vent to aid in ventilation and smoke removal
  10. Roof crew preparing to deploy hose line down through second vent opening for interior attack
  11. Roof crew advised to use caution when removing vents; metal rail support missing in that section due to the vent openings
  12. Command authorizing roof crew to remove one vent and apply water into the opening to attack the fire from above
  13. Smoke diminishing after water applied through roof vent opening
  14. Command checking whether smoke from first roof vent is staying down or coming back up after opening second vent
  15. Water showing progress; still some residual smoke from the first vent hole, not fully extinguished yet
  16. Smoke coming out of the lowest door on the front (Alpha side) of the building
  17. Command reports a hot spot on the wall about halfway down the silo, directly below the vents; crews directed to aim water straight down the wall at that location
  18. Crews directing water along a pipe angled from the hot spot on the silo wall to attack the fire from a new angle
  19. Crews adjusting nozzle aim to target the wall where the hot spot is located on the silo
  20. Crews spraying water directly at the wall where the hot spot is located on the silo
  21. Crews call for Star 3 unit to bring elevator equipment to assist at the scene
  22. Firefighter Tell breaking through walls with water stream; heat signature increasing, indicating hidden fire being opened up
  23. Thermal imaging still shows heat about halfway down the wall, but smoke is diminishing; firefighters are making progress
  24. Firefighter spraying the wall is hearing noise and experiencing increased heat rising toward his gloves; heat source still present
  25. Command directing crews to continue spraying operations on the wall with positive effect
  26. Star 3 all clear from the scene.
  27. Crews continuing to spray; smoke levels unchanged, photos and video sent to command
  28. Command advises hot spot remains below beds; crews breaking through crust to reach seat of fire, heat staying high despite increased spraying
  29. Crews had temporary loss of control of nozzle while suppressing fire
  30. Crew on scene reports 1800 pounds of air remaining in SCBA cylinder; staying out of IDLH, requesting additional personnel to continue operations or will manage from current position
  31. Command authorizes crew rotation; crew member with low air supply will exit, fresh crew members standing by to continue operations; command maintaining accountability at scene
  32. Command reports a MILO (mobile incident light/command vehicle) en route to assist at the fire ground
  33. Firefighter Tell heading down from the fire; crew remaining in position to continue operations
  34. Water escaping from multiple openings, including the chimney and auger opening on the alpha side; crews continuing to supply water to control the fire
  35. Firefighter staging on the front (Alpha) side awaiting next crew member to join for continued operations
  36. On Charlie side: only one firefighter at a time needed away from direct vent exposure to maintain safe air supply
  37. Command directing another firefighter to the Charlie side to relieve operations
  38. Command requesting personnel to retrieve 2 1/2-inch hose line from upper level via rope
  39. Firefighter 30 heading up the aerial ladder
  40. Firefighter descending the aerial ladder while lowering a 2.5-inch hose line
  41. Crews requesting water supply to establish water flow for fire attack
  42. Crews retracting equipment from the roof during fire attack operations
  43. Crews moving to the Charlie side (rear) of the building during fire attack operations
  44. Roof Ops reports fire extinguishment complete on the Charlie side of the building

Radio recording 8:12 · 42 transmissions

0:00-8:12

What was said on the public scanner radio about this call, in order. Download MP4

Add what you know

Were you there, or do you know more? Add details, photos or a video. Everything is reviewed before it shows.