Structure Fire
6171 Rogue Lane Northeast, Plainfield
Timeline
- Chimney fire spreading into the roof at 6100 block of Rogue Lane NE; Plainfield Fire Monitor, Rockford Engine 8, and Cannon units dispatched
- Plainfield Car 5 on scene at a small two-story home; flames showing from the chimney; Rogue Lane Command established
- Rockford Engine 8 on scene; confirming small two-story home with flames showing from the chimney
- Cannon Engine 4 en route to the scene (20:32 hours)
- Plainfield Car 5 conducting 360-degree walk-around inspection of all building sides
- Defensive mode established; crews switching to defensive firefighting, tactical channel 41 PLF active, personnel accountability confirmed
- Water supply established; Engine 3 directed into position to connect
- Fire out in the fireplace; flue closed, checking for salvage equipment
- Cannon Engine 4 on scene, switching to tactical channel 41 PLF (Plainfield fire ground operations)
- Command establishing staging area on Rogue River Drive for incoming units
- Command staging Squad 1 on Rogue River Drive to handle additional incidents or calls during the fire operation
- Tactical channel 41 clear; fire at 6100 block of Rogue Ln NE is clear
- Two firefighters on roof heading toward the rear (beach side) of the building
- Roof crew requests second roof ladder for operations on the rear side of building
- Command confirming second roof ladder will be delivered to crew on the rear side of building
- Crews on the rear side requesting additional lighting
- Squad 1 deploying lighting to the Charlie side (rear) of the building
- Incident command terminated; all units cleared at 20:15
- Rockford Engine 8 clear of scene, returning to quarters
- Roof crew preparing for ventilation work; getting ready to cut roof opening
- Roof crew authorized to cut opening for ventilation; outer door and flue secured
- Roof crew remaining in place; command considering whether to deploy additional ventilation bags or continue with current tactics
- Additional crew standing by and available if needed
- Ventilation crew reports still active live embers in the fireplace
- Command reports significant temperature drop; ventilation crew confirms active embers but no flames in the fireplace
- Command dispatching Rockford Engine 8 to bring chimney bucket; crews will clean out the fireplaces
- Command authorizing roof crew to exit if roof temperature drops to 90 degrees
- Firebox cleared; ventilation crew awaiting command to begin venting the building
- Command directing Rockford Engine 8 to break down the water supply line
- All personnel cleared from roof; building fire operations winding down
- Remaining units cleared from the assignment and released to service
- Rockford Engine 20 cleared from the assignment and released to service
- Fire scene cleared; police taking over the investigation
- Squad 1 cleared from the scene
- All Cannon units cleared from the scene
- Rockford Engine 52 on scene
Radio recording 6:30 · 36 transmissions
0:00-6:30
What was said on the public scanner radio about this call, in order. Download MP4