Unknown Medical Alarm
3600 block of E Fulton St, Grand Rapids
Timeline
- Unknown medical alarm at an apartment complex
- Command directing Engine 3 crew to open the ceiling upstairs for fire investigation and overhaul
- Engine 3 directed to open the ceiling on the second floor for fire investigation and overhaul
- Basement search complete and clear
- Fire knocked down; crews working on overhaul, checking for remaining hot spots
- Crews working in the master bedroom upstairs; other units to avoid that area during overhaul operations.
- Crews advise to avoid the Charlie Bravo bedroom upstairs during overhaul operations
- Alpine Car 1 (Charlie Division Supervisor) heading to the scene for incident command
- Engine 3 making entry to the second floor to check ceiling for fire extension
- Crews request ladders deployed to one side of building; teams actively operating on the second floor
- Ladders not deployed to the Charlie (west) side of the building; teams continue operations on the second floor
- Engine 3 exiting the building with low air; requesting air supply to recycle (refill tanks).
- Command requesting additional personnel to help remove equipment and debris from the building
- Crews continuing overhaul on the second floor; command standing by to continue exterior work once interior operations clear
- Secondary search cleared on the second floor; continuing overhaul operations
- Engine 3 confirms no one on the second floor
- Command directing Engine 3 to hold off the second floor; Charlie Division spraying from exterior, overhaul operations continuing
- Command reassigning personnel: Engine 1 operator moving to drone operations; Morick assigned to Engine 1 pump panel
- Charlie division: exterior fire under control; crews needed on second floor Charlie side to work on ceiling damage
- Plainfield Squad 1 staging in uncommitted area, assigned as backup for next two alarms at this incident
- Command assigning crews to check the basement for fire extension; fire started on the ground floor outside
- Command calling for a personnel accountability report (PAR) from all crews on scene
- Command requesting Sparta Platform 5 to start their aerial operation
- Command directing crews to check the second floor for fire spread, open ceilings as needed; hose line already staged upstairs
- Engine 1 crew of four confirms they have a team on the second floor.
- Sparta Platform 5 positioning for operations; four personnel assigned to platform.
- All units giving PAR (personnel accountability report); Plainfield Engine 3 reporting
- Engine 1 reports PAR (personnel accountability report): three crew members accounted for
- Engine 1 power report: four crew members accounted for, one member with Charlie (minor injury/status)
- Engine 4 power report: four personnel accounted for on scene
- All personnel accounted for (PAR complete on the fire ground)
- Command directs crews to descend and rotate out after cable is secured
- Crews report 4x4 ventilation holes opening in the roof to release heat and smoke from the interior
- Crews being released to decontamination to remove gear and rest briefly
- Incident command requests crews to check the other floors of the building while they are inside
- Crew working on hot spots in the attic
- Command requesting Engine 1 to perform a complete walk-through of all three levels of the building
- Engine 1 will bring equipment back up and check all three floors for fire spread
- Sparta Platform 5 operating on the second floor
- Medic 236 notified that the fire is cleared and units can return to service
- Medic 236 cleared from scene; incident command terminated
- Engine 1 checking interior basement and main floor for fire extension
- Command requesting fans to ventilate smoke from the gable (roof vent area)
- Crews opening attic space at the gable above the stairwell to ventilate heat; temperatures still running 190–200 degrees
- Crews checked all three floors; structure clear of fire
- Crews scanned the second floor; highest temperature reading 110 degrees
- Medic 236 on scene at structure fire